EDUCATION · In Progress

EXPLORE
OVERVIEW
A two-storey school expansion adding eight classrooms and a science laboratory wing to an existing campus. LGS framing was selected for its speed of construction to minimise disruption to ongoing school operations during the summer break window.
This educationproject was delivered by SYSOL Limited's engineering and detailing teams from concept through fabrication-ready drawings. Light Gauge Steel framing was specified for its rapid deployment, structural precision, and compliance with Pakistan's building codes.
HIGHLIGHTS
Fast-track LGS construction within 10-week summer break window
Seismic-resistant braced-frame design per BCP Seismic Zone 2B
Science laboratory reinforced framing for fume-hood anchorage
Prefabricated CFS panels assembled on-site with bolted connections