LOADING ·
Loading…LOADING ·
Loading…PROJECT · 012 / 024
INDUSTRIAL · In Progress

EXPLORE
OVERVIEW
A single-storey logistics warehouse and dispatch centre using CFS portal frames for column-free interior spans. The mezzanine office level was detailed with CFS floor joists and load-bearing walls to create a two-level administrative zone within the warehouse envelope.
This industrialproject was delivered by SYSOL Limited's engineering and detailing teams from concept through fabrication-ready drawings. Light Gauge Steel framing was specified for its rapid deployment, structural precision, and compliance with United States's building codes.
HIGHLIGHTS
CFS portal frames achieving 20 m clear spans for warehouse bays
Mezzanine CFS floor system supporting 80 psf office live loads
Dock-height loading bay frames with reinforced header beams
AISI S100 wind and gravity engineering with PE certification