INDUSTRIAL · Completed

EXPLORE
OVERVIEW
A three-storey, 120-bed worker accommodation block within an industrial zone. LGS panelised construction was selected for its speed-to-occupy advantage, with the entire structure erected and enclosed in under eight weeks despite summer heat constraints.
This industrialproject was delivered by SYSOL Limited's engineering and detailing teams from concept through fabrication-ready drawings. Light Gauge Steel framing was specified for its rapid deployment, structural precision, and compliance with United Arab Emirates's building codes.
HIGHLIGHTS
Panelised LGS construction achieving 8-week structural erection
Dubai Municipality building code and civil defence compliance
Corrosion-resistant G550 Z275 galvanised steel in coastal climate
Fire-rated corridor and stairwell assemblies to UAE fire code