LOADING ·
Loading…LOADING ·
Loading…PROJECT · 013 / 024
COMMERCIAL · Completed

EXPLORE
OVERVIEW
A full-floor commercial office fitout within an existing high-rise using CFS interior partitions, bulkheads, and soffit framing. Over 300 lineal metres of non-structural CFS framing were detailed for rapid drywall installation across the open-plan floor plate.
This commercialproject was delivered by SYSOL Limited's engineering and detailing teams from concept through fabrication-ready drawings. Light Gauge Steel framing was specified for its rapid deployment, structural precision, and compliance with United States's building codes.
HIGHLIGHTS
300+ lineal metres of CFS partition and soffit framing detailed
Deflection-head track details for high-rise inter-storey drift
Coordinated MEP rough-in within 92 mm stud cavity framing
Accelerated 3-week installation schedule with prefabricated panels